Case studies
Real jobs, customer names removed. Numbers measured on the delivered files.
Case study
Two steel assemblies: 160 hours of drafting down to 104
Two welded assemblies, 344 bodies, from STEP to cutting drawings, booklets and nesting. 35% less time, every part checked by software.
Case study
A STEP with no bill of materials: building it from the 3D
200 bodies, no parts list. Type, thickness and material read from the geometry, identical parts grouped: 198 parts became 139 drawings.
Case study
Assembly drawing balloons numbered from the model
263 and 177 balloons: each one reads the part it points at and gets its code. Zero wrong numbers, parts list generated, stainless parts marked.